These photos were taken on October 17th.
This photo shows the tubing for servicing the drive thru.
This was the ceiling drywall being hung.
The masons were blocking the drive thru exterior.
The guys from Tri-City were quick on the ceiling install!
These photos were taken on October 22nd.
The interior walls are going up.
I lucked out and showed up at the site at just the right time. I got to set a brick right by the front door.
It was fun for one but, making sure everything is level is a lot of work. I left the rest to the pros!
This is the ceiling above the teller counter. It was a custom design by Gerace and we couldn't be happier with it!
This is looking at it from the opposite angle.
Welding up the brackets for the front entrance sign.
Here we are doing the electrical and data walk thru with Essexville Electric and Gerace.
Here they are setting the glass in the meeting room.
These photos were taken today!
Here is Jeff from Essexville Electric wiring the lights for above the teller counter.
Jodi got me standing in my office window before the framing went in.
Tri-City working on the drywall and Smilie working on the HVAC.
This was the highlight of my visit today!! I was trusted enough to set some of the glass in my office windows. Watch the video and see if I'm hired or fired!!
With Jodi getting her first visit since it took shape she needed a posed picture!
Night drop and drive thru window are installed. The ATM will arrive later but, for now it heats the building!