Thursday, December 27, 2012

Six

A new billboard on US-10.

The chairman helps clean the coin counter.
Choice Office Products was on site putting together the furniture.  Here they are working on my desk.

Paint touch ups.
 Dumpster gets picked up tomorrow and Jim was going to fit everything!

 Klender was out installing the directional signs.
Gates on the dumpster area were installed.
 Diebold was out peeling the protective plastic off of the drive thru window.
 Jen from CTI brought the phones and started installing them.
 The final pieces of cabinetry were brought in.

Wednesday, December 26, 2012

A week from today!

I cannot believe we are down to a week.  We have some hurdles to get over to make sure we pull this off.  We got this!

Today we moved two fire proof filing cabinets.  They are filled with concrete and about 1,000 lbs. each.  And, by we, I mean my Dad, cousin and friends from Adesa Great Lakes Auto Auction, I just took the photos and held the door.





Waste Management dropped off our dumpster today.  It was way too cold and windy to go outside and take this picture from the kitchen window.

 The TV in the meeting room was hung.


The Corian trim piece was glued into place.


Everywhere was caulked.


Thursday, December 20, 2012

December 19 & 20


The Chairman stopped by to check on the progress!


The building inspector and fire chief were out as well.

 My interview with the chief.

Bathroom sinks function!

 Darin demonstrating the toilet paper holders I bought were too big.

Appliance delivery.


Flagpole prep.

 Raising the flagpole.  They only hit one car!  My video skills are rather poor on this one.

Inlighten installing the TV in the lobby.
Diebold working on the security and teller equipment.





Water fountain.

 This was on December 19th and they looked wonderful. 
 It would be hard to tell today with the weather.

 Darin and Ken making notes for the drywallers and painters.


 Tri-City working on the notes.

Jim working on the drive thru cabinets.

 Three Rivers working on the finishing touches of the teller counter.

 Jeff powering up the teller counter.

 Front of the teller counter.

Back of the teller counter.

 I'm not sure if they are working or. praying after all this work, the Mayans are wrong.

Mounting hardware.

 Scraping the tape off the tile.

 Door handles. Yes, this one took all three of them! :)

Signage was installed above the drive thru.



 It was also installed above the front entrance.



 I took this right before I left tonight.  I think it looks awesome!