The Chairman stopped by to check on the progress!
The building inspector and fire chief were out as well.
My interview with the chief.
Bathroom sinks function!
Darin demonstrating the toilet paper holders I bought were too big.
Appliance delivery.
Flagpole prep.
Raising the flagpole. They only hit one car! My video skills are rather poor on this one.
Inlighten installing the TV in the lobby.
Diebold working on the security and teller equipment.
Water fountain.
This was on December 19th and they looked wonderful.
It would be hard to tell today with the weather.
Darin and Ken making notes for the drywallers and painters.
Tri-City working on the notes.
Jim working on the drive thru cabinets.
Three Rivers working on the finishing touches of the teller counter.
Jeff powering up the teller counter.
Front of the teller counter.
Back of the teller counter.
I'm not sure if they are working or. praying after all this work, the Mayans are wrong.
Mounting hardware.
Scraping the tape off the tile.
Door handles. Yes, this one took all three of them! :)
Signage was installed above the drive thru.
It was also installed above the front entrance.
I took this right before I left tonight. I think it looks awesome!
Looks Great! If you need any Grand Opening Party Equipment we are a member, and have our business accounts with Copoco! Sad to see Julie, leave the Saginaw Branch, but happy for her at the same time!
ReplyDelete